Arrival
A clean, prepared crew checks access and lays out the exact footprint.
Anatomy / 01—04
Every layer is chosen for stability, longevity, and a surface that ages with character.

Ground-contact rated footings
Kiln-dried structural lumber
Pressure-treated lumber, built to last
Stainless hidden fasteners
The build day / Eight hours
A clean, prepared crew checks access and lays out the exact footprint.
Footings are set and verified on the decimal grid.
The structure locks square, level, and true.
Pressure-treated boards are selected, spaced, and invisibly fastened.
Perimeter details are cut with furniture-grade precision.
We clean the site, walk the build, and hand it over.

“You see every cut, every check, and every decision. Transparency is part of the craft.”
Reserve / Fixed price

Submitting a request does not charge you. We confirm access and site suitability before your date is secured.